Article
Publication date: 3 May 2022

Olufisayo Adedokun and Temitope Egbelakin

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on…

Abstract

Purpose

Despite several research efforts tackling construction project risks globally, tertiary education building projects are not devoid of experiencing risks with cascading effects on projects. In the past decades, there has been increasing application of linear assessments of risks in construction risk management practices. However, this study aims to assess the influence of risk factors on the success of tertiary education building projects using a structural equation modelling approach. This study will further reinforce the risk factors that require attention because risk factors are not linear but interdependent.

Design/methodology/approach

A quantitative research method was undertaken in this study, where data collection was achieved via a structured questionnaire survey. In total, 452 questionnaires were administered to client representatives, consultants and contractors involved in executing tertiary education building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were found usable for the analysis, implying a response rate of 61.73%. The Cronbach α test, average variances extracted and composite reliabilities values show high reliability and internal consistency of the instrument used for data gathering. Furthermore, the study adopted percentile, mean, correlation, regression analysis and structural equation modelling for analyzing the data collected upon which the study’s inferences were based.

Findings

The study found that three out of six criteria for measuring the success of tertiary education building projects were significantly affected by risk factors while using the structural equation modelling technique. With this non-linear method of assessment, completion to time was significantly impacted by environmental risk factors. In addition, safety performance was also significantly influenced by logistic, environmental and legal risk factors; furthermore, logistics, design and environmental risks significantly affected profit. However, completion to cost, standard/quality and end-user satisfaction was not significantly affected by the risk factors in tertiary education building projects.

Research limitations/implications

The quantitative data used for the analysis are limited to the tertiary education building projects from selected five tertiary education institutions in Ondo State; therefore, the results do not indicate all tertiary institutions in Nigeria. In addition, the findings are based on building projects that were procured through a competitive tendering arrangement only and thus considered a limitation for this study.

Practical implications

Not all the risks significantly influence the tertiary education building projects. Therefore, risk factors with a significant effect on the success indicators of tertiary education building projects should be prioritized for a successful project. While risk factors have not affected the completion to cost per se, the study implies that the resultant effect of risks on other success indicators could have a cascading effect on these projects in terms of cost and time overruns. These results may assist during the project risk management while also addressing complexity and uncertainty to avoid chaos in a tertiary education building projects.

Originality/value

The study found significant construction risk factors impacting the success of tertiary education building projects using a non-linear methodology, an extension beyond the usual linear method of assessment of risk impacts on the project performance.

Details

Journal of Facilities Management , vol. 22 no. 1
Type: Research Article
ISSN: 1472-5967

Keywords

Article
Publication date: 23 November 2021

Olufisayo Adewumi Adedokun, Temitope Egbelakin, Deborah Oluwafunke Adedokun and Johnson Adafin

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among…

Abstract

Purpose

Despite the huge capital outlay in tertiary education building projects (TEBP), these projects undoubtedly failed in meeting the set objectives of cost, time and quality, among others. Therefore, rather than the impacts of risks on the overall project performance, which is common in the construction management literature, the purpose of this study is to assess the impacts of risk factors on the criteria for measuring the success of public TEBP.

Design/methodology/approach

The paper adopted a quantitative research method where the data collection was via a questionnaire survey. The researcher administered 452 questionnaires to the client representatives, consultants and contractors involved in building projects across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and suitable for the analysis, translating to a 61.73% response rate. The reliability analysis of the research instrument showed 0.965 and 0.807, via Cronbach’s alpha test, indicating high reliability of the instrument used for data collection.

Findings

The study found different risk factors affecting the criteria for measuring the success of TEBP. For instance, the environmental risk factor significantly impacted completion to cost, while financial and political risk factors significantly impacted completion to time. In addition, while environmental, legal and management risks significantly impacted end-user satisfaction, safety performance was significantly impacted by logistic, legal, design, construction, political and management risks. Besides, the logistic, legal, design, construction, financial, political and management risk factors impacted profit. However, despite profit being one of the criteria for measuring the success of building projects, it recorded the highest risk impacts amounting to 41% variance.

Research limitations/implications

The findings are limited to the public tertiary education building projects procured via competitive tendering; therefore, the results might differ when considering other procurement methods.

Practical implications

The practical implication is that rather than focusing on all risk factors, the project stakeholders could give adequate attention to the significant risk factors impacting each of the parameters for measuring the success of education building projects.

Originality/value

The study revealed specific risk factors impacting the criteria for measuring the success of TEBP, which extend beyond the use of the overall project performance approach.

Details

Journal of Engineering, Design and Technology , vol. 21 no. 6
Type: Research Article
ISSN: 1726-0531

Keywords

Article
Publication date: 20 October 2023

Olufisayo Adedokun and Temitope Egbelakin

Of all the deaths associated with disasters, bushfires account for 40% of these fatalities. The resulting fatalities are consequent upon householders’ decision-making, leading to…

Abstract

Purpose

Of all the deaths associated with disasters, bushfires account for 40% of these fatalities. The resulting fatalities are consequent upon householders’ decision-making, leading to late or non-evacuation from at-risk communities. However, while decision-making is a function of risk perception, this paper aims to investigate householders’ perceptions of bushfire risks following the catastrophic Black Summer bushfires of 2019/2020.

Design/methodology/approach

An inductive research approach was adopted. Thirty semi-structured interviews were conducted to elicit qualitative data from southeastern NSW, Australia householders. The data were collected via face-to-face and online Zoom. Each interview was recorded, transcribed using Otter.AI and thematically analyzed with NVivo 12 Pro (Braun and Clarke, 2006, 2019). In addition, inter-rater reliability was done by engaging an independent researcher to code the de-identified data independently. The codes were cross-checked for reliability and adjusted where necessary.

Findings

It was found that bushfire risk perceptions were high among the householders in bushfire at-risk communities following the 2019/2020 Black Summer bushfires. High levels of perceptions were recorded among the participants regarding the likelihood of bushfire occurrence, concern for bushfires, severity of bushfires and vulnerability to bushfire threats.

Research limitations/implications

The study’s results do not reflect all householders in the southeastern part of NSW. It was limited to 30 householders who indicated their intentions to participate and are living in the study area. Therefore, future studies should be undertaken with more participants from broader geographical areas, including emergency responders like firefighters, recovery officers and non-government organizations in charge of recovery operations. This study will add to the prioritization of risk perceptions.

Practical implications

All else being equal, elevated bushfire risk perceptions among participants can potentially decrease the fatalities linked with bushfires and their subsequent ripple effects. This holds particularly true when residents opt for early self-evacuation from at-risk communities.

Social implications

The paper contributes to developing a better understanding of the bushfire risk perceptions underlying the evacuation decision-making of the residents in bushfire at-risk communities in south-eastern NSW of Australia.

Originality/value

The paper contributes to the existing knowledge on bushfire risks by providing insights into residents’ perceptions after the catastrophic 2019/2020 Black Summer bushfires. As a qualitative study, it describes bushfire risk perceptions on four themes: likelihood, concern, severity and vulnerability, which is uncommon in many bushfire studies.

Details

International Journal of Disaster Resilience in the Built Environment, vol. ahead-of-print no. ahead-of-print
Type: Research Article
ISSN: 1759-5908

Keywords

Article
Publication date: 30 August 2021

Olufisayo Adedokun, Isaac Aje, Oluwaseyi Awodele and Temitope Egbelakin

The non-performance of construction projects in meeting the set objectives has continued to draw researchers worldwide. Despite this, little attention is accorded to public…

Abstract

Purpose

The non-performance of construction projects in meeting the set objectives has continued to draw researchers worldwide. Despite this, little attention is accorded to public tertiary education building projects in Nigeria. Therefore, on this background, this study aims to assess the perceptions of stakeholders on the level of occurrence of risk factors in the public tertiary education building projects (TEBP) to enhance the performance of these projects.

Design/methodology/approach

The study adopted a quantitative method of data collection via a questionnaire survey. In total, 452 questionnaires were administered to the respondents comprising client representatives, consultants (quantity surveyors, architects, services and structural engineers and builders) and the contractor. The respondents were involved in the conception and execution of TEBP across five public tertiary education institutions in Ondo State, Nigeria. Of 452 questionnaires, 279 were retrieved and found suitable for analysis, indicating a 61.73% response rate. The reliability analysis for the research instrument was 0.965 via the Cronbach α test, indicating the high reliability of the instrument used for the data collection. Moreover, the clusters of risk factors also had reliability values that ranged between 0.719 and 0.875.

Findings

The study found inflation, delayed payments in contracts, high competition bids, delay in work progress and occurrence of variations are the most frequently occurring risk factors in public TEBP. By contrast, difficulty to access the site, environmental factors and pollution were found to be low-weighted risks with the least likelihood of occurrence. The results of this study indicated the existence of significant differences in some of the risk factors in terms of the level of risk occurrence in TEBP. The risk factors were eventually clustered into eight major groups for TEBP. The post hoc comparisons using the least significant difference test also indicated differences between the contractors and consultants in the ranking of risks occurrence in TEBP, but no significant differences between clients/contractors and clients/consultants.

Research limitations/implications

The findings in this study are limited to the public TEBP procured via competitive tendering; therefore, the results might not be applicable when other procurement methods are being considered. Besides, the study classified the project participants based on organizations and not on the different ownership status of the projects, such as federal or state government-owned TEBP. However, the literature shows that likelihood of risk occurrence could vary due to the degree of project ownership.

Practical implications

The information provided with respect to the most frequently occurring risk factors would enhance the performance of public TEBP.

Originality/value

This study contributes to the existing body of knowledge on the subject within a previously unexplored context where insights were provided on the most frequently occurring risk factors on the public TEBP.

Details

Journal of Financial Management of Property and Construction , vol. 27 no. 2
Type: Research Article
ISSN: 1366-4387

Keywords

1 – 4 of 4